Prior to the spray foam/cellulose installers, we needed to run speaker wire. We didn't want to run it along the walls or the floors so we ran it in the walls and ceiling.
This only took us about 3 hours to do, but meant that we arrived home about 11pm. Sydney was with us the whole time. I was amazed we didn't have a meltdown. Oh, and sydney was well behaved too.




No comments:
Post a Comment